This comprehensive procedure provides structured assistance for the construction of temporary housing for families whose homes have been completely damaged or partially damaged by earthquakes. The procedure outlines a systematic approach to manage the grant distribution, emphasizing the identification of eligible families through a collaborative effort between local authorities and technical personnel. The grant, totaling NPR 50,000, is to be distributed in two installments, with a clear focus on timely and efficient utilization for housing construction. Significantly, the procedure includes detailed annexes that provide a framework for the implementation of the guidelines. These annexes contain essential elements such as the required documentation for a grant application, a list of construction materials, and construction guidelines, ensuring clarity and transparency in the process.
Legal Document
Procedure
NDRRMA
2023